Network Rail operates a large portfolio of Auto Reconfiguration systems used to support the resilience of 400V TN S and 650V IT signalling power supplies. Many of these systems have been operational for more than two decades and face several challenges:

  • Obsolescence of essential components affecting maintainability and availability
  • Reliance on legacy telecoms (such as 3G) due to national network withdrawals
  • Rising failure risk due to ageing cables, switchgear and protection components
  • Limited diagnostic capability in existing systems
  • Inconsistent compatibility with modern power protection and monitoring solutions
  • Increasing sustainability pressures, including carbon reduction and waste minimisation

To support Network Rail’s long-term asset strategy and maintain operational performance, we are exploring a future programme to introduce a modern, cyber secure, modular, maintainable Auto Reconfiguration SPS platform. This aligns to wider organisational objectives including:

  • Improving safety and reliability for passengers and freight
  • Supporting digital railway capabilities
  • Reducing operational carbon
  • Enhancing maintainability
  • Delivering sustainable whole life value

This preliminary market engagement will help confirm commercial viability, test supplier capability, and identify innovative approaches to support a future-proofed solution. It also seeks to understand the level of interest from the supply chain for any future tendering activity.