Site Emergency Generator Maintenance
THE PIRBRIGHT INSTITUTE. Combined from multiple notices.
- Stage
-
Awardthe latest stage the buyer has published
- Buyer
-
THE PIRBRIGHT INSTITUTE
- Supplier
-
Vital Power Ltdtaken from the supplier contact on the notice
- Value
-
£56.4KVAT basis not stated · GBP
- Awarded
-
3 Jun 2026the signed contract date on the notice
- End date
-
For subscribers only
- First published
-
25 Nov 2025last seen 29 Jun 2026
What the buyer published
- Project Objectives/Background
1.1. The contract is for a single supplier to provide Maintenance and Servicing to the Institute’s Standby generators. 2. Scope
2.1. In the event of failure to critical infrastructure the Institute must be able to rely on swift engineering attendance with diesel generators and associated cabling in a range from 500kVA to1500kVA engines within time measure associated with a high containment site. Suggested time frame is 4 hours between callout and site attendance. 2.1.1. Each generator requires two service visits per year, one minor and one major visit. 2.1.2. We expect to be advised of if any of the generators require changing or replacing items such as Oil require testing samples to verify this change. Oil/Air and fuel filters, coolant, Oil, fuel lines, fuel quality, plugs, leads etc. Service dates to be set out in advance between the Pirbright maintenance scheduler and company contact. Several visits may have to be arranged due to our building shutdown schedule so it may not be possible to service all the engines in one continuous site visit. It is also suggested that the site has a dedicated engineer who would seek to attain security clearance for the site so as to work independently of engineering services escorting engineers and to have a skill level where they are able to sign on and off work permits in advance and following servicing or breakdown or extra to contract works. 2.1.3. One essential requirement is to ensure power supplies remain on at all times, this is achieved through a series of UPS’s DRUPS and standby generators. 2.1.4. Subcontractors are expected to attain a high standard of maintenance, conducting themselves with professionalism and having an attitude of continuous improvement. The generator engineer will be reporting and working alongside the Site Electrical Supervisor to structure building “On/Off load” testing and maintenance. 2.1.5. It is preferable that the site has a dedicated maintenance engineer and
The buyer published this contract more than once.
We combine all notices into one record, so it only appears here once.
| Notice | Published | Type | Stage |
|---|---|---|---|
| 076874-2025 | 25 Nov 2025 | planning | |
| 014018-2026 | 16 Feb 2026 | Tender notice | tender |
| 045441-2026 | 18 May 2026 | Award notice | award |
| 060631-2026 | 29 Jun 2026 | Contract details | award (current) |